Cost guide

Planning a bathroom remodel budget in Brevard

A bathroom budget works best when it is built from scope lines, not from a single number. This guide shows how to list those lines, how to hold a reserve for what is hidden and how to compare proposals so that you are looking at the same job from each contractor.

Get My Free Estimate

Free estimate, no obligation. Takes about a minute.

Start with scope, not a number

Before you look at proposals, write down what you want: what stays, what changes, and what you are unsure about. A scope that says “remodel the hall bath” leaves too much open. One that says “replace the tub with a curbless shower, new vanity, new tile and a quiet fan” can be compared line by line.

This guide gives no dollar figures because the right number depends on the room, the layout and the selections. A contractor who has visited the house can give you an itemized written proposal.

Budget lines to list

  • Demolition and disposal: removal of fixtures, tile and waste.
  • Plumbing: drains, supply lines, valves and fixtures, by a licensed trade.
  • Electrical: circuits, lighting, fan and GFCI protection, by a licensed trade.
  • Waterproofing and substrate: the shower pan, backer and membrane.
  • Tile and finish materials: tile, grout, vanity top and paint.
  • Fixtures and glass: faucets, toilets, vanity, mirrors and shower glass.
  • Permits and inspections: fees and the time involved.
  • Reserve: a separate line for hidden damage.

Hidden damage and the reserve

Water damage behind an old tub or shower often shows only after demolition. A reserve gives you room to handle it without stopping the project. Ask each contractor how they price hidden damage, how they notify you and how change orders are approved in writing.

A reserve is not extra profit. If it is unused, it is yours. Ask the contractor to write that into the contract.

Allowances and selections

An allowance is a placeholder amount for items you have not yet chosen, such as tile or fixtures. If the allowance is low, the final price rises when you choose. Ask each contractor what allowance they used for each item and compare them. A lower total with low allowances is not a better offer.

Where budgets drift

Decide early, keep the layout if you can and put every change in writing before the work happens.

  • Changing selections after work has started.
  • Moving drains after the slab is open.
  • Custom glass or specialty tile with long lead times.
  • Unexpected damage found during demolition.
  • Requests for extras that are not in the contract.

Comparing proposals

Put each proposal in a table, one row per scope line. Note missing items such as permits, disposal or glass. Compare payment schedules, warranties and the estimated timeline. Confirm that each proposal shows the contractor’s license number, as Florida law requires, and verify it on the state website.

Keep a decision log

Record each decision with the date, the choice and the cost effect. A log makes change orders easy to check and helps you remember why a choice was made when the invoice arrives.

What a bathroom estimate should list

Ask for demolition, waterproofing, tile, plumbing, electrical and glass priced as separate lines for your project, so two bids are comparing the same room. How bathroom estimates work. Ask how long the room will be out of use, who coordinates the plumber, electrician and tile setter, and what happens to the schedule if the demolition uncovers rot or outdated pipes. Written answers to those three questions explain more about a bid than its total does.

From first call to a finished bathroom

  1. Walk the room with the contractor and agree what stays, moves or goes.
  2. Compare itemized written proposals, including plumbing, electrical, tile and glass.
  3. Choose fixtures and tile early, since lead times often set the schedule.
  4. Confirm permits and inspections for any plumbing or electrical changes.
  5. Walk the finished room, test the fixtures and keep warranty and permit papers.

Vet the contractor first

Look the contractor up on the state DBPR license search before a deposit changes hands for this kind of project, and ask for a current certificate of insurance. Ask which licensed plumber and electrician will handle those parts, and how the shower will be waterproofed. The rest of the vetting list is on the checking-a-pro page. If the bid includes a shower or tub, ask how the waterproofing will be done and tested before tile goes up. A written description of the waterproofing method is a reasonable request.

Bathroom remodel questions, answered

How should I build a bathroom budget?

List scope lines: demolition, plumbing, electrical, waterproofing, tile, fixtures, glass, permits and a reserve for hidden damage. Ask each contractor to price the same lines so you compare proposals fairly. Photograph and measure the room before bids, so each contractor starts from the same facts.

How much reserve should I hold?

Ask the contractor how hidden damage is priced and how change orders work, then hold a reserve for it. The amount depends on the age and condition of the bathroom. Ask for the reserve in writing and for any unused part to stay with you.

Why do proposals differ so much?

They often cover different scope, materials or allowances. Compare each line, check allowances and find out what is excluded. Ask each contractor to price the same selections and the same assumptions. A shower glass line or a heated floor can sit in one bid and not in another.

Should I pay a large deposit?

Tie payments to stages of work, and avoid paying ahead of what has been completed. Ask what the deposit covers and keep copies of the contract and every change order. A bid that asks for most of the total before any work begins is worth questioning.

Bathroom projects this guide touches

References:Florida Statutes 553.79 (permits and exemptions) (accessed Nov 2026); Florida Statutes 489.113 (contractor scope and subcontracting) (accessed Nov 2026); Florida Statutes 489.119 (contractor license number in proposals) (accessed Nov 2026). General information, not legal advice; confirm with the office that covers your address.

Guide reviewed November 2026.